Rtpi Chartered

Arborfield: (June 2026)

Our portfolio showcases projects across multiple sectors, reflecting Woolf Bond’s expertise in planning, consultation, appeals, and environmental processes.
Screenshot 2026 10 16 112750 (1)

About This Project

Following a two week public inquiry in March 2026, we have secured for our client an outline permission for up to 111 dwellings in Arborfield, Wokingham. The decision is a useful reminder that a site which is not directly adjacent to a policy settlement boundary (Arborfield Cross, in this case) it can still be a sustainable location for development. This site in particular was on a the route of a premium bus service (providing easy access to secondary schools and employment), and also benefitted from a pedestrian pavement to the local primary school and convenience store. There were a number of technical issues at play and upon which evidence was advanced at the inquiry. These were (i) the sustainability of the location (ii) whether the development would prejudice delivery of emerging site allocations by using up headroom in the highway network capacity; (iii) whether veteran trees were adequately protected; (iii) whether a Sequential Test was needed due to the inclusion of footbridge which crossed over flood zone 2 (but did not land within it); (iv) Impacts on the Thames Basin Heaths SPA and SANG capacity (and the use of grampian conditions to secure the same); and (v) and landscape impacts more generally. Alongside these we presented evidence on emerging Local Plan proposals including a large strategic site in close proximity to the appeal site. With the housing land supply position agreed at 2.3-2.5 years, the inspector agreed with us that the various technical points were fully addressed and managed via the proposed conditions and s106 obligations; and that the tilted balance supported the grant of planning permission.

PDFs For This Project:

Location Of Project:

Form submitted successfully

Thank you for your enquiry, we will get back to you shortly.